DislikedHey Ron -
If you want to handle the cross filter for GbpUsd for H1, that would be great. Since it sounds like you may want to do an additional filter or pair, I will leave that up to you. We still have the cross n-sync filter for both GbpUsd H1 and M30. And since you have experience, anyother pair you would like to optimize using either the cross filter or the cross n-sync filter would be fine.
...........
P.S. I was thinking this would also work well with exotics like GbpChf, EurAud and EurCad. If you have time and want to check those in...Ignored
Is there some redundancy with assignments I saw on Page 1 of thread? And would you be specific about the slope crossings you would like an individual to do, unless we do all 3 possibilities?
Damon, in optimizing the first full protocol, at the point of doing the SL, it would not post *any* data.
I went on to try the TS, and same thing.
So I have not proceeded past this point.
On other clarification:
at the instruction for the first use of the slow slope, you wrote to use 4 for Fast Slope stop, but the # is missing when you meant (surely) to say to use *5* for the Slow Slope Value there.
I look to hear from you about why Optimization does not post for SL & TS.
As far as my double checking tells me, I have it set up correctly.
Best to all,
Ron