-
Construction Work Done, Australia, Preliminary, September 2024
In seasonally adjusted terms in the September quarter: • Total construction work done rose 1.6% to $73,344.9m • Building work done rose 0.7% to $38,638.0m • Engineering work done rose 2.6% to $34,706.9m The trend estimate for total construction work done rose 0.7%. The value of total construction work done rose 1.6% in the September quarter, in seasonally adjusted terms. The increase was driven by engineering work, which rose 2.6% in the September quarter and is 6.0% higher than the same time last year. Building work rose 0.7% and is 0.8% higher than the same time last year. The trend estimate for total ... (full story)